Boeing Utility Lines
The JMC² team served as civil engineering consultants, responsible for the assessment of site-wide sewer systems, the condition and routing of over 5,000 feet of GN2, and water trunk lines throughout the Santa Susana Field Laboratory. Combining current industry and design standards, JMC² used water-modeling software to develop in-depth and detailed reports that included a comprehensive assessment of alternatives (with cost of estimates) respecting the various pipeline protection techniques. In this way, clients can determine the most sensible solutions for them.